Unit 1 - a large warehouse production building; divided for metal plating, construction and repairs, assembly and spray shop, and laboratory testing. |
 |
Unit 2 - a two-story office and production building; divided on the ground floor for metal finishing, inspection, jigging, and effluent treatment. The first floor for reception, offices, and meeting room areas. |
 |
Unit 3 - a single-story production building; used for machine engineering, and housing a metal stripping facility. |
| Watford West Works |
 |
A separate effluent system area and external storage building; assists the factory’s needs and requirements as part of the ongoing production processes. |